![]() Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants. Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork. Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing. Masonry, Unit Masonry, Concrete Unit Masonry. General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.Ĭoncrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Structural Concrete, Precast Concrete Slabs. This would start after the 76,000 addition/expansion is completed.Ĭasino, 250,000 SF Addition, Hotel/Motel, New Construction, 250 Unit(s). ![]() Project will be 250,000 sq ft addition and include construction of a 250 room hotel. ![]() ![]() Spirit of the Woods - Manistee Gateway Project ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |